In brief
Isaiah Taylor argues that nuclear power has stalled because the industry treats it as a design and paperwork problem, when it is really a hardware and manufacturing problem. Valar Atomics builds simple, passively safe reactors, turns them on quickly, and learns from each one. He says the US Department of Energy testing pathway made this possible. His bet is that cheap, abundant energy will create its own demand.
The central tension is speed against caution. Taylor says the company moves fast by deleting complexity, building its own parts when vendors quote years and millions, and paying for reactors with venture equity rather than waiting on project finance. The safety case rests on physics rather than operators: the reactor is designed to cool itself even if every system fails. The episode shows an early demonstration of that claim, not scale.
Facts
Stated by the speakers. Each quote matches the transcript, which shows what was said, not that it is true.
Valar Atomics connected an NVIDIA Blackwell chip directly to its nuclear reactor and describes this as the first AI chip powered by a nuclear reactor.
“We powered the first ever AI chip powered by a nuclear reactor. So we took an NVIDIA Blackwell, super grateful to them for providing the system to us.”
0:35:04 · Isaiah Taylor · AI chip demo
Valar Atomics hosted the nuclearwebsite.com site directly from a chip powered by its reactor, and the site would go offline once the reactor was turned off.
“If you go to nuclearwebsite.com, that website is directly hosted on the nuclear reactor.”
0:35:04 · Isaiah Taylor · Nuclear website
Valar's reactor was started under Executive Order 14301, which called for three advanced reactors to reach criticality on US soil by July 4th.
“the reactor that's behind us here was turned on under an executive order. It was EO14301, which called for three advanced reactors to go critical on American soil by July 4th.”
0:10:14 · Isaiah Taylor · Executive order
Taylor says the US Department of Energy was briefly named the Energy Research and Development Agency, or ERDA, about two years after being split off from the Atomic Energy Commission.
“the Department of Energy was originally called the ERDA, the Energy Research and Development Agency.”
0:08:51 · Isaiah Taylor · DOE history · 1970s
Congress split the Atomic Energy Commission, which handled both commercial deployment and testing, into the Nuclear Regulatory Commission for deployment and a separate agency for testing.
“Congress taking the Atomic Energy Commission, which was one agency responsible for both commercial deployment and for testing.”
0:09:17 · Isaiah Taylor · Nuclear regulation · 1970s
Taylor says the Three Mile Island accident involved a loss of reactor cooling, which he cites as the reason US reactor building stopped.
“We had a nuclear incident in the Three Mile Island reactor. And in that incident, we essentially lost the ability to cool the reactor.”
0:04:28 · Isaiah Taylor · Three Mile Island · 1970s
Taylor states that the Three Mile Island accident caused no deaths, no injuries and no radiation dose to the public.
“Now, nobody died. In fact, not only did nobody die, nobody was injured and there was no radiation dose to the public.”
0:04:56 · Isaiah Taylor · Three Mile Island · 1970s
Taylor says decay heat after a reactor shutdown is about 5 to 6 percent of its previous continuous power and must be removed to avoid meltdown.
“decay heat is about 5 % to 6 % of what your continuous power was before you shut down.”
0:13:03 · Isaiah Taylor · Decay heat
Valar flew its entire plant, including the control room, from Hawthorne to Utah on C-17 military aircraft.
“the entirety of the plant, including a control room, flew with us on the C-17s. First time that's ever been done, which is pretty cool.”
0:11:14 · Isaiah Taylor · Reactor transport
Taylor says the Ward 250 reactor was producing 100 kilowatts at the time of recording.
“We're currently, as we're sitting here, making 100 kilowatts, splitting something like 10 to the 17 atoms per second in this reactor behind us.”
0:10:47 · Isaiah Taylor · Reactor output
Valar reached its first criticality, a cold critical pile with no power output, in November, and first made power at Ward 250 a few days before this interview.
“So we went critical back in November. That was our first criticality. That was what you'd call a cold criticality or critical pile.”
0:24:41 · Isaiah Taylor · Project Nova
Valar took two years and four months from incorporation to its first atom split, then about seven months to the second reactor.
“So our first ever mark from filing in Delaware to first atom split was two years and four months. From Project Nova, first atom split to the second time here in this reactor was about seven months.”
0:25:32 · Isaiah Taylor · Tick rate
Taylor says Ward 250 is the fifth new nuclear device to make power in the United States since 2000 and the first advanced reactor by a startup.
“This is the fifth new nuclear device to make power in the United States since the year 2000.”
0:26:31 · Isaiah Taylor · Ward 250 · 2000s
The Ward 250 reactor is shielded by 78 inches of concrete in a structure Valar calls the modular citadel.
“The reason we're able to stand here and not be receiving unhealthy doses of radiation right now is because there's 78 inches of concrete in front of this reactor.”
0:27:34 · Isaiah Taylor · Bioshield
Valar has a Citadel factory in Salt Lake City that can produce 3,000 precast shielding blocks a year.
“We have what we call the Citadel factory in Salt Lake City. And we have a production line where we can create 3 ,000 blocks a year that are identical to these.”
0:28:04 · Isaiah Taylor · Citadel factory
Valar developed its own concrete grade without rebar, because rebar can become activated by neutrons and turn into nuclear waste.
“we also can't use rebar because if we use rebar, rebar becomes activated by neutrons. So you'll actually be producing nuclear waste.”
0:38:20 · Isaiah Taylor · Concrete design
Two Valar engineers collected rock samples across the US over about three weeks to find the right mix for the shielding concrete.
“they literally flew all around the country collecting rock samples from all around the United States. We called it the rock hunt.”
0:38:54 · Isaiah Taylor · Rock hunt
Valar stacked the modular citadel in about 42 hours, versus about three months for a conventional bioshield.
“to we stacked this in about 42 hours.”
0:30:23 · Isaiah Taylor · Construction speed
Taylor says each of three analog-to-digital electronics boxes in Valar's control skid cost $450,000 and that Valar paid that to avoid delay.
“Each one of those boxes costs $450 ,000. This is when anyone talks to you about like cost and nuclear, like, oh, nuclear is expensive.”
0:43:55 · Isaiah Taylor · Control skid costs
Valar's reactor protection system uses three sections that vote, and shuts the plant down if two judge it unsafe.
“So it has three different sections that vote against itself to say is the plant in a safe state or not. And if two of them vote that the plant is not in a safe state, it shuts down.”
0:44:58 · Isaiah Taylor · Reactor protection
Valar built its own reactor protection system in six weeks for about $400,000, after a vendor quoted about $5 million and roughly two and a half years.
“six weeks later, we had a working RPS and we spent about $400 ,000 on it.”
0:45:59 · Isaiah Taylor · Reactor protection
Taylor says the Ward 250 uses TRISO fuel, graphite moderation and helium cooling and describes it as about as safe as a reactor can be built.
“a triso-fueled, graphite-moderated, helium-cooled reactor of the geometry that we've built it here is just about as safe as humanity knows how to build a nuclear reactor.”
0:31:48 · Isaiah Taylor · Reactor design
Valar added a helium purification system to remove moisture released from graphite blocks, a problem Taylor links to the Fort St. Vrain reactor.
“So we have mitigated that risk by having a helium purification system”
0:20:39 · Isaiah Taylor · Moisture control
Taylor says his great-grandfather was a nuclear physicist on the Manhattan Project during World War II.
“My great-grandfather was a nuclear physicist on the Manhattan Project.”
0:02:52 · Isaiah Taylor · Founder background · 1940s
Taylor credits Charles Hall's aluminum electrolysis with turning aluminum from a precious metal into a structural one once energy became cheap enough.
“Charles Hall here in the United States figured out aluminum electrolysis and cheap enough energy means that you can actually just separate that oxide from the aluminum and you can have pure aluminum metal.”
0:57:01 · Isaiah Taylor · Aluminum history